DECENT HOMES PROGRAMME UPDATE – SEPTEMBER 2010

Newark and Sherwood Homes along with our partners Bullock and Connaught successfully completed its Decent Homes Programme in March 2010.This has been a tremendous achievement and over 5000 of our properties have benefitted from the extra investment of £49.5 million to achieve 100% compliance with the  Governments Decent Homes Standard. 

Newark and Sherwood Homes are currently formulating plans to enable that it continues to maintain the level of Decency  that we have achieved during the Five Year programme.

The Decent Homes standard is split into four sections and includes:

1. Fitness Standard

Structural stability, provision of w/c, bath or shower, water supply, food preparation area and drainage.

2. State of Repair

Roof, walls chimneys, windows, doors, heating and boiler.

3. Modern Facilities

Age of kitchen and bathroom, kitchen space and layout, bathroom and W/C location.

4. Thermal Comfort

Heating type, wall construction and insulation.

Failure of a single item to meet the requirements of the Fitness Standard section would mean that work is required to the property. However, in other sections of the Decent Home Standard, two or three items would need to fail to trigger work on the property.

For example the Kitchen and Bathroom can be older than the criteria allows, but the Modern Facilities section requires three individual failures within the section to cause the property to fail.

The Following Table Denotes the Total number of Elemental Componants Completed during the Five Year Programme. 

Elements of work

Number of Properties Completed

Kitchen Renewals

2473

Bathroom Renewals

1497

Window Replacements

4104

External Door Renewals

2189

Central Heating Renewals

1236

Replacement Roof

546

Lintol/External repairs

668

Electrical Rewiring

84

Properties made Decent with all works completed

5069

If you have any questions regarding the delivery of The Decent Homes Programme please telephone: 0845 258 5550.

Alternatively if you would like to become involved in monitoring the Performance of the Decent Homes Contract or the formation of working party to consider improvements to Decent Homes or other investment works please telephone 0845 258 5550.

If you would like any further information on the decent homes standard please click on the following link to the Office of the Deputy Prime Minister website: www.odpm.gov.uk